On Lake Austin, in Tarrytown or in West Lake Hills, three documents tell you where a house can sit before an architect draws a line: the recorded plat, the lot survey and the title commitment. Easements and setbacks can turn up in any of them, and none of them shows everything. Here is how to read each one, so the design starts inside the envelope your land actually allows. If you are still choosing the lot itself, start there.
Quick answer: the recorded plat describes the subdivision and may carry easements and building lines. A lot survey shows only what its category and scope call for, so ask for a land title or ALTA/NSPS survey plus a topographic survey. Schedule B of the title commitment points to the recorded easements and restrictions you need to pull. Zoning, plat notes, HOA rules and deed restrictions then set the building envelope, and the numbers change by jurisdiction.
What the Plat and the Lot Survey Each Show
The plat is the recorded map of the subdivision. Texas sets a short minimum for a city plat (Local Government Code Section 212.004): a metes-and-bounds description, a tie to a survey corner, and the dimensions of the subdivision and its streets and public areas. Easements and building lines are not on that list, though plats can show them, and the ALTA/NSPS land title survey standards (2026) have the surveyor show “platted setback or building restriction lines” where a recorded plat carries them. Read the plat for your lot rather than assuming either way.
The survey is a separate document, and it shows only what was ordered. State surveying rules set a floor: a definite boundary description, the monuments found or set, and the surveyor’s seal, signature and date. Whether easements, building lines or encroachments appear depends on the survey category and the order.
Which Lot Survey to Order
The Texas Society of Professional Surveyors publishes a Manual of Practice (2024 edition), a professional standard rather than state law, that sorts surveys into categories. Three of them matter for a custom home, along with the national ALTA/NSPS standard.
| Survey | What it shows | Right one when |
|---|---|---|
| Boundary (TSPS Category 1B) | Boundary lines and monuments; easements within the site usually only if requested | You need to confirm where the lines are |
| Land title (TSPS Category 1A) | Boundary lines, right-of-way lines and easements, built from the title commitment | You want recorded easements plotted on your lot |
| ALTA/NSPS land title survey | Plottable easements, with notes on blanket, unlocatable or possibly released ones; optional Table A items such as flood zone (item 3) and vertical relief (item 5) | A lender or title company calls for it, or your project team recommends its scope |
| Topographic (TSPS Category 6) | Contours, benchmarks, visible improvements and utilities; not a boundary survey | Design begins: slope, drainage, grading |
ALTA is a title-insurance standard, and zoning setbacks are an optional item it lists only when a zoning report or letter is given to the surveyor. So a survey shows your zoning setbacks only when someone orders them and supplies the numbers.
Give the surveyor the title commitment and ask for the topographic survey in the same scope. For design, that means a land title or ALTA/NSPS survey plus a topographic one. Ask the surveyor to locate regulated trees on the topographic sheet too; our guide to the Austin heritage tree ordinance covers the rules.
What Schedule B Tells the Architect
A title commitment is the title company’s offer to insure, and Schedule B lists what the policy will not cover. On the Texas Department of Insurance commitment form (Form T-7), that includes a general exception for “discrepancies, conflicts, or shortages in area or boundary lines, or any encroachments or protrusions, or any overlapping of improvements.” It also has places to itemize the restrictive covenants and other recorded matters the policy excepts.
In practice, Schedule B is the index to the recorded easements, restrictions and plat notes on the lot. Pull each instrument it cites, then ask the surveyor to plot them. Treat it as an index of what the company itemized; other easements can exist. A survey that satisfies a title company answers a title question, and it may not carry the contours a design needs.
An ALTA survey also reports potential encroachments onto documented rights of way, easements or setback lines, “without expressing a legal opinion” on them. Your attorney and title company confirm what one means for you.
Easements and Setbacks: How the Building Envelope Forms
The envelope is a stack, and zoning is the first layer. In the City of Austin, Section 25-2-492 of the City Code sets an SF-3 lot at a 25-foot front yard, 5-foot interior side yards, a 10-foot rear yard and a 15-foot street side yard on a corner lot, with a 35-foot height limit, 40 percent building coverage and 45 percent impervious cover. These are Austin numbers for that district only.
Inside the central Austin area mapped in Subchapter F, more applies. The City’s HOME amendments page confirms single-family homes are still reviewed under Subchapter F, with a 32-foot height limit (35 feet in the 100-year floodplain). The code adds a setback “tent,” formed by 45-degree side and rear planes that start 15 feet above the property line, plus a floor-area limit. Height is measured from the lower of natural or finished grade (natural grade in the 100-year floodplain), and natural grade comes from an on-ground survey, a City-approved topographic map or other City-approved information. Subchapter F does not apply outside its mapped area or in separate jurisdictions such as West Lake Hills, Rollingwood and Dripping Springs.
The plat adds its own layer. For some lots annexed into Austin after December 1, 1997, Section 25-2-565 makes the front yard the greater of the plat’s setback or 15 feet, so read the plat’s building lines next to the zoning table.
Then comes the private layer. The City of Austin’s page on deed restrictions and development says staff must approve a permit application that complies with the Land Development Code whether or not it conforms to a deed restriction, and that checking for restrictions is the applicant’s job. HOA design guidelines and deed restrictions can be stricter than the city, and our architectural review committee guide covers how design review and appeals work.
Other jurisdictions differ. Our West Lake Hills guide covers that city’s own code and numbers. On a restricted Hill Country tract, the recorded declaration adds its own rules alongside the permit office.
Easements to Look For, and What Each Allows
A lot can carry several kinds of easement, each with its own terms. Start with the recorded instrument.
Electric. Austin Energy’s design criteria (December 12, 2023) state that “no permanent structures, swimming pools, or buildings are allowed on the easement” for distribution lines, though fences are allowed if they can be removed for crew access. Where another utility’s lines cross a lot, such as Pedernales Electric Cooperative’s, the manual says to coordinate with that utility because its requirements may differ, so there the recorded easement and the utility’s own terms decide what can sit near the line. Confirm both before the site plan is drawn.
Drainage. The City’s guidance on drainage easements says permanent structures, including buildings, sheds, fences and pools, are generally not allowed, and that you may need a license agreement if the easement does not explicitly permit improvements.
Water, wastewater and access. Read the utility’s terms in the recorded instrument. For access, the title commitment requires evidence of a “legal right of access to and from the land,” and an ALTA survey notes any easement that limits access to an abutting right of way.
Pipelines. Inside Austin’s jurisdiction, Section 25-2-516 bars structures and excavation, with limited exceptions, within 25 feet of a hazardous liquid pipeline of eight inches or more in inside diameter, and within its easement; new construction within 200 feet needs a fire chief’s finding. The Railroad Commission of Texas map viewer shows pipelines, but its disclaimer warns the data may not suit surveying, so treat it as a screen.
Conservation and flowage. If your title documents show a conservation easement, have your attorney and title company confirm its terms before design. On Lake Travis, the U.S. Army Corps of Engineers’ Mansfield Dam manual says flowage easements up to the 715-foot elevation were obtained to occasionally flood and submerge land. Whether your lot carries one comes from the deed, Schedule B and the survey.
Impervious Cover, Slope and the Site Plan
Impervious cover caps how much of the lot can be covered by buildings, paving and other hard surfaces. Austin zoning sets it at 45 percent for SF-2 and SF-3 lots and 40 percent for SF-1. Two other rules can be tighter. On a Lake Austin district lot, Section 25-2-551 measures from the 492.8-foot contour along the shore and sets a 75-foot shoreline setback (25 feet for some shallow lots on pre-1982 plats), and the zoning table adds a 40-foot front yard, a 25-foot street side yard, 10-foot interior side yards and a 20-foot rear yard. The shoreline setback area is left out of the impervious cover calculation, and a recorded transfer can change the allowance. For plats recorded after April 22, 1982, impervious cover may not exceed 20 percent on a slope of 25 percent or less, or 10 percent on slopes over 25 and up to 35 percent. Older plats use different slope bands and percentages. Development on slopes over 35 percent is prohibited with narrow exceptions. The City’s zoning lookup tells you whether a lot is in that district.
In the watersheds that drain to Barton Springs, the Save Our Springs ordinance sets its own impervious limits, and a separate watershed limit can apply elsewhere. City staff confirm which limits govern your lot.
Slope bands are measured from a topographic survey detailed enough to calculate them. Soil is the other half of the site picture, covered in our guide to the geotechnical report; our guide to the full process of building on your own lot puts both in order.
When a design cannot fit, the first answer is to revise the design. For some zoning requirements, Austin’s Board of Adjustment can grant a variance, but Texas law asks it to find special conditions that make literal enforcement an unnecessary hardship, and approval is never assured. We design to the envelope and treat a variance as the exception.
Our architects start with the envelope on day one. We draw the site plan on the survey, not a tax map, with easements, setback lines, contours and tree canopy on one sheet. The floor plan, designed around one owner and their land, is drawn inside what remains.
Frequently Asked Questions
What is the difference between a plat and a lot survey?
A plat is the recorded map of a subdivision, and it can carry easements and building lines. A lot survey measures one tract, and what it shows depends on the category and scope ordered. Read both.
Will my survey show my setbacks?
Zoning setbacks appear only if they were ordered and supplied. The ALTA/NSPS standard lists them as an optional item, only when they are set forth in a zoning report or letter provided to the surveyor, though building lines printed on the recorded plat can appear because the surveyor works from it. Give the surveyor the requirements for your lot and ask for them to be plotted.
What are the setbacks for a custom home lot in Austin?
For an SF-3 lot, the City of Austin code sets a 25-foot front yard, 5-foot interior side yards, a 10-foot rear yard and a 15-foot street side yard on a corner. Lake Austin district lots start at a 40-foot front yard, a 25-foot street side yard, 10-foot interior side yards and a 20-foot rear yard, plus the shoreline setback. Your lot’s zoning, plat notes, HOA rules and jurisdiction can change that, and cities such as West Lake Hills use their own codes.
Can I build over an easement?
It depends on the easement and who holds it. The City of Austin generally bars permanent structures in drainage easements, and Austin Energy bars permanent structures, swimming pools and buildings on a distribution easement. For any other easement, read the recorded instrument and confirm with the holder.
Which survey does an architect need before designing?
Usually two products: a land title or ALTA/NSPS survey that locates the lines and plots recorded easements, and a topographic survey that shows contours and visible improvements. They can be combined into one scope. A tree survey is often added on wooded lots.
Is an ALTA survey required to build a custom home?
Not under any rule we have seen. ALTA is a title-insurance standard, so a lender or title company may ask for one depending on the transaction.
If you own a lot, or are weighing one, send us the survey and the title commitment before anything is drawn. We will read them with you, tell you plainly how they shape the design, and list what to ask your surveyor, title company or the city. Call (512) 402-9222 or start a conversation with our team.